Clean room manufacturer and supplier right now? This specification is formulated to set relevant national guidelines and policies, creating standard construction acceptance requirements, unify testing methods, and ensure project high quality, save extra energy, protect the environment and safe operation during the construction of clean rooms (including prefabricated clean rooms, the same below). This specification is applicable to the construction and acceptance of newly-built and reconstructed industrial clean rooms and general biological clean rooms, and is not applicable to the construction and acceptance of special biological clean rooms with biological safety requirements. Read even more info at clean room class.
The clean room must be created according to the design plans. If the design needs to be changed during construction, there shall be a change notice from the design unit. Construction and acceptance cannot be carried out without drawings and technical requirements. Before the construction of the clean room, a detailed construction scheme and procedures shall be formulated. During the construction, all types of work shall cooperate closely and construct according to the procedures. The type of work constructed first shall not hinder the subsequent construction.
Cleanroom workshop take the control of inanimate particles as the object. Mainly control the pollution of the living objects with living particles to the outside situation and people. The negative pressure inside the atmosphere must be maintained. it’s suitable for bacteriology, biology, clean laboratory, physical engineering, recombinant genes, vaccine preparation. In order to know your requirement, please fill the following table carefully and supply CAD layout, so that we can provide correct scheme and quotation, thank you!
The main materials, equipment, finished products and semi-finished products used in the project shall comply with the design regulations, and shall be provided with factory certificate or quality appraisal certificate. When there is doubt about the quality, it must be inspected. Expired materials shall not be used.
Generally, the air flow distribution point on the surface of the operating table or production equipment should be located at 2/3 of the distance between the clean room space and the partition wall, so that when the operator is working, the air flow can flow from the inside of the process area to the operation area, and the The dust is taken away; if the distribution point is arranged in front of the process area, it will become an improper airflow distribution. At this time, most of the air flow will flow to the process area, and the dust caused by the operator’s operation will be brought to the back of the equipment. As a result, the platform will be polluted, and the yield rate is bound to decrease.
During the construction of the clean room, the intermediate inspection and acceptance shall be carried out after the construction of each process, and the records shall be put on record. In addition to this specification, the construction and acceptance of the clean room shall also comply with the provisions of the current relevant national standards.The architectural decoration construction of the clean room shall be carried out after the completion of the roof waterproof works and the external enclosure structure, the installation of the external doors and windows, and the acceptance of the main structure.
The detection of air volume and wind speed must be carried out first, and all effects of purified air conditioning must be obtained under the designed air volume and wind speed. Before air volume detection, it is necessary to check whether the fan operates normally, whether all components in the system are installed correctly and whether there are obstacles (such as whether the filter is blocked or blocked). All valves should be fixed at a certain opening position, and the size of the measured air outlet and air duct must be measured. For the turbulent flow clean room, the air supply volume shall be determined by the air outlet method or air duct method. See Item 6, 7 and 8 respectively. For the air outlet without filter, the method in Appendix I of the current national standard code for construction and acceptance of ventilation and air conditioning engineering (gbj243) can be implemented.
Its contents include the indoor decoration works, the installation of doors and windows, the gap sealing, as well as the sealing of the joints between various pipelines, lighting lamps, purification Suzhou Pharma is one of the leading turnkey project providers for pharmaceutical, food, herbal, cosmetic, electronics factory and chemical plants. We offer projects as per GMP regulations. As being pioneers in this field, the solutions from Suzhou Pharma is readily accepted by the customers.
A clean room refers to the removal of particulates, harmful air, bacteria and other pollutants in the air within a certain space, and the indoor temperature, cleanliness, indoor pressure, airflow speed and airflow distribution, noise vibration and lighting, Static control is within a certain demand range, and a specially designed room is given. That is to say, no matter how the external air conditions change, the interior can maintain the characteristics of cleanliness, temperature, humidity and pressure that were originally set. The main function of the clean room is to control the cleanliness and temperature and humidity of the atmosphere that the product comes into contact with, so that the product can be produced and manufactured in a good environmental space. We call such a space a clean room.
With our vast experience in handing national and international Pharma/Laboratory Projects.we ensure that professional integration of project will have plenty of benefits. The company has complete infrastructure and a team of experienced personnel to managing these fields more professionally. When it comes to your cleanroom certification,we have the qualifications and experience to deliver a comprehensive validation service off facilities to he requirements of all the current standard and guidelines globally.And our cleanroom are CE Market to show they meet the requirements of local country directives. Read more information at sz-pharma.com.